Revamp Of Usiminas Sinter Plant 1 & 2 Drum Mixer

- Organization:
- Associacao Brasileira de Metalurgia, Materiais e Mineracao
- Pages:
- 12
- File Size:
- 793 KB
- Publication Date:
- Oct 1, 2019
Abstract
Sinter maximization in the blast furnaces charge has proven to be the most economically viable way to produce pig iron at Usiminas. This fact has led the company to develop projects aimed at increasing the production of sintering. In this context, the present work shows the recent experience of Sintering Machines 1 and 2 drum mixer exchanging contributing to the increase of operational productivity due to the optimization of the original design. For 13 days was the replacement of the original drum installed in 1974 by a new drum with improvements in the design of the internal and the sprinkling water system. The improvements contributed to the effective formation of micro-pellets and, as a result, increased productivity of Sinter Machines. Several aspects of the project are presented: engineering, planning, safety, manufacturing, technical quality, schedule and a comparison between the parameters of the equipment operation before and after the implantation
Citation
APA:
(2019) Revamp Of Usiminas Sinter Plant 1 & 2 Drum MixerMLA: Revamp Of Usiminas Sinter Plant 1 & 2 Drum Mixer. Associacao Brasileira de Metalurgia, Materiais e Mineracao, 2019.