RI 8888 - Overlap Probability for Short-Period-Delay Detonators Used in Underground Coal Mining

- Organization:
- The National Institute for Occupational Safety and Health (NIOSH)
- Pages:
- 26
- File Size:
- 1994 KB
- Publication Date:
- Jan 1, 1985
Abstract
The Bureau of Mines investigated coal-mine-type short-delay electric detonators marketed by three domestic manufacturers to determine the accuracy of delays and the probability of overlap between adjacent de- lay periods. The Winzer index was computed and compared with the probability of overlap. A close agreement between the Winzer criterion and overlap probability was demonstrated. A permissible blasting unit capable of delivering a maximum firing energy of 4.0 J and a digital oscilloscope were used to measure the delay time with an accuracy of 20.25 ms. Another oscilloscope and a pulse transformer were used to record firing current. Experimental data indicated negligible overlap probability in detonators of shorter delay periods: periods 1 to 4, which correspond to 25 to 250 ms. However, a significant probability of overlap was detected in some detonators of longer delay periods: periods 5 to 9, which cor- respond to 300 to 500 ms.
Citation
APA:
(1985) RI 8888 - Overlap Probability for Short-Period-Delay Detonators Used in Underground Coal MiningMLA: RI 8888 - Overlap Probability for Short-Period-Delay Detonators Used in Underground Coal Mining. The National Institute for Occupational Safety and Health (NIOSH), 1985.