Rib-pillar mining at Sigma Colliery

The Southern African Institute of Mining and Metallurgy
J. J. S. de Beer F. Hunter A. F. Neethling
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
10
File Size:
864 KB
Publication Date:
Jan 1, 1991

Abstract

SYNOPSIS The paper describes the rib-pillar extraction method now used at Sigma Colliery in the Orange Free State. In this method, access roadways (with a high safety factor) are developed into a block of coal suitable for total extraction; pillars that have a low safety factor are then formed and extracted immediately. The method, together with the current practices of labour management, has resulted in better utilization of the coal resources and capital, increased production and labour productivity, and improved safety.
Citation

APA: J. J. S. de Beer F. Hunter A. F. Neethling  (1991)  Rib-pillar mining at Sigma Colliery

MLA: J. J. S. de Beer F. Hunter A. F. Neethling Rib-pillar mining at Sigma Colliery. The Southern African Institute of Mining and Metallurgy, 1991.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account