Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor

Society for Mining, Metallurgy & Exploration
Samuel J. Gambino
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
7
File Size:
243 KB
Publication Date:
Jan 1, 2008

Abstract

Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using precast segmental lining would provide additional storage volume. The risk of encountering unexpected conditions or events and the resulting cost impacts could differ significantly for these two options. A probabilistic life-cycle cost analysis of these alternatives was performed. This paper discusses the construction alternatives considered, the risk assessment methodology used to evaluate these alternatives, the input parameters and risk factors used in this analysis, and the recommended project which is currently being constructed.
Citation

APA: Samuel J. Gambino  (2008)  Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor

MLA: Samuel J. Gambino Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor. Society for Mining, Metallurgy & Exploration, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account