Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 243 KB
- Publication Date:
- Jan 1, 2008
Abstract
Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using precast segmental lining would provide additional storage volume. The risk of encountering unexpected conditions or events and the resulting cost impacts could differ significantly for these two options. A probabilistic life-cycle cost analysis of these alternatives was performed. This paper discusses the construction alternatives considered, the risk assessment methodology used to evaluate these alternatives, the input parameters and risk factors used in this analysis, and the recommended project which is currently being constructed.
Citation
APA:
(2008) Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest InterceptorMLA: Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor. Society for Mining, Metallurgy & Exploration, 2008.