Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 539 KB
- Publication Date:
- Jun 23, 2024
Abstract
The Tunnel of Guillermo Gaviria Echeverri, spanning 6.05 miles, will be Latin America’s longest
road tunnel, is currently under construction in Colombia’s Antioquia Department with a single bidirectional tube
connected to a parallel rescue tube through multiple cross-passages. The study faces challenges in implementing
the prescriptive semitransversal ventilation system due to design restrictions. Different ventilation concepts are
eplored to nd the most suitable system for regular operation and re scenarios. A quantitative ris assessment
evaluates each alternative system and identies the longitudinal ventilation system, accompanied by ris
mitigation measures, as the safest choice, since it surpasses the prescribed semitransversal ventilation concept.
Citation
APA:
(2024) Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024MLA: Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.