Rockpass Stability And Rehabilitation At AngloGold Ashanti?s Tau Lekoa Mine

The Southern African Institute of Mining and Metallurgy
G. B. Dukes
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
6
File Size:
1575 KB
Publication Date:
Jan 1, 2006

Abstract

Scaling of rockpasses was problematic at Tau Lekoa Mine prior to production commencing in 1991. High horizontal stress levels relative to the host rock mass strength have been instrumental in causing the observed scaling. Scaling has been more pronounced in the deeper rockpasses and these are monitored regularly. Rehabilitation of one of the reef passes and one of the waste passes was required in the period 1999 to 2001. This paper describes the extent of the problems experienced to date as well as the rehabilitation completed.
Citation

APA: G. B. Dukes  (2006)  Rockpass Stability And Rehabilitation At AngloGold Ashanti?s Tau Lekoa Mine

MLA: G. B. Dukes Rockpass Stability And Rehabilitation At AngloGold Ashanti?s Tau Lekoa Mine. The Southern African Institute of Mining and Metallurgy, 2006.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account