Sail Rsp Blast Furnace No. 5 - A Greenfield Project In A Brownfield Optimization Context

Associacao Brasileira de Metalurgia,  Materiais e Mineracao
Jan Bak
Organization:
Associacao Brasileira de Metalurgia, Materiais e Mineracao
Pages:
8
File Size:
1031 KB
Publication Date:
Aug 2, 2018

Abstract

Rourkela Steel Plant (RSP), which is operated by the Steel Authority of India Limited (SAIL), was inaugurated in 1959 and was the first Integrated Steel Plant in the public sector in India. In 2013, RSP commissioned their No. 5, 4060 m³ Blast Furnace, India's largest. It was built as a turn-key project by a consortium consisting of Danieli Corus and Tata Projects Ltd. and is entirely based on the technology and know-how of Danieli Corus. The new Blast Furnace is the key element of an expansion program that doubles the plant's production capacity and with much of the existing ironmaking capacity reaching the end of its technical and economic life span, it enables RSP to meet existing as well as growing demand for its products. This article discusses how this greenfield Blast Furnace was built in an existing and operating Integrated Steel Plant. It covers the accommodation of land, planning of the new installation to fit the available plot as well as the updated logistical lay-out of the plant. Technical details of the installation are presented, including their consequences for RSP's environmental performance and new perspectives for campaign planning.
Citation

APA: Jan Bak  (2018)  Sail Rsp Blast Furnace No. 5 - A Greenfield Project In A Brownfield Optimization Context

MLA: Jan Bak Sail Rsp Blast Furnace No. 5 - A Greenfield Project In A Brownfield Optimization Context. Associacao Brasileira de Metalurgia, Materiais e Mineracao, 2018.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account