San Diego Courthouse Commons Tunnel: Challenges and Design Solutions - NAT2022

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 15
- File Size:
- 6326 KB
- Publication Date:
- Dec 1, 2022
Abstract
The Courthouse Commons Tunnel facilitates the secure transfer of inmates between the County Jail and State Courthouse across a city block in downtown San Diego, California. This shallow tunnel was excavated using the Sequential Excavation Method in soft ground. It passes under 8- and 10-story buildings with a foundation cover of 6 feet, and crosses the active San Diego Fault with a design offset displacement of 18 inches. In this paper, key design challenges of tunnel construction are presented: limiting building settlements without using underpinning of building foundations and incorporating an oversized seismic section with seismic joints and crushable backfill
Citation
APA:
(2022) San Diego Courthouse Commons Tunnel: Challenges and Design Solutions - NAT2022MLA: San Diego Courthouse Commons Tunnel: Challenges and Design Solutions - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.