San Francisco Downtown Rail Extension Project: Evolution of Mined Tunnel Construction Approach and Design - RETC2023

Society for Mining, Metallurgy & Exploration
Kush Chohan Yiming Sun Meghan Murphy
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
17
File Size:
364 KB
Publication Date:
Jun 13, 2023

Abstract

DTX is a 1.3-mile-long rail extension being constructed by Transbay Joint Powers Authority to extend Caltrain rail service and future California High Speed Rail service to downtown San Francisco. It includes a 3,352-foot-long mined tunnel with a cross section varying from 50 to 60 feet wide and 43 feet high to accommodate two- and three-rail tracks. DTX will be excavated in mixed-face and Franciscan Formation with ground cover ranging from 40 to 85 feet. This paper discusses how mined tunnel design has evolved since the initial preliminary design phase over 10 years ago. The current design concept for tunnel construction is also discussed.
Citation

APA: Kush Chohan Yiming Sun Meghan Murphy  (2023)  San Francisco Downtown Rail Extension Project: Evolution of Mined Tunnel Construction Approach and Design - RETC2023

MLA: Kush Chohan Yiming Sun Meghan Murphy San Francisco Downtown Rail Extension Project: Evolution of Mined Tunnel Construction Approach and Design - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account