Scheduling Model for Section of Sintering-Blast Furnace

The Minerals, Metals and Materials Society
Daguang Lu
Organization:
The Minerals, Metals and Materials Society
Pages:
8
File Size:
283 KB
Publication Date:
Jan 1, 2009

Abstract

The section of sintering and BF (blast furnace) is very important in iron-making process. In practice, the scheduling is so extensive that three faults unfavorable to continuous product will be easier to happen. This paper introduces the integration Petri Net and GA (genetic algorithm) as suitable tools for simulation and optimization of scheduling to section of sintering- BF under a certain hot iron or-der. The situation of the iron plant Chongqing Iron and Steel Company is researched in approach above mentioned. By analysis, the conclusion is drawn that scheduling with optimized values can maintain continuity of key operations , can satisfy order of hot iron in maximal degree and can keep the best stability of key storages.
Citation

APA: Daguang Lu  (2009)  Scheduling Model for Section of Sintering-Blast Furnace

MLA: Daguang Lu Scheduling Model for Section of Sintering-Blast Furnace. The Minerals, Metals and Materials Society, 2009.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account