Secondary means of egress via emergency gig

The Australasian Institute of Mining and Metallurgy
S Green R Austerberry
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
13
File Size:
1654 KB
Publication Date:
Mar 15, 2021

Abstract

The discovery of the Cuffley Lode at Mandalay Resources Costerfield Operations provided an opportunity to extend mine life via mining the offset depth extension of the previously worked Alison Mine. Access from the existing Augusta Mine placed the initial Cuffley underground workings at approximately 250 metres depth from surface. As the new orebody transitioned towards production, a secondary means of egress needed to be established. The depth of the initial capital development presented a challenge in establishing a secondary means of egress that could be confidently relied on. The availability of land to locate a surface shaft collar further reduced available options and geotechnical drilling further limited suitable shaft locations. Time limiting factors such as permitting and having a secondary means of egress in as soon as possible, further highlighted that an innovative secondary means of egress was needed. A consideration of using an emergency gig lowered by a suitable sized crane supplied by an external crane contractor was investigated and found to be a suitable outcome. This Emergency Gig was deployed via the Cuffley Return Air Raise. When trialled, the emergency gig was found to provide a reliable, repeatable extraction method with an acceptable level of risk. Issues discovered during such trials further improved the process to a point where this extraction method became the adopted secondary means of egress for additional lodes that existed at depth. When assessing possible methods of secondary means of egress, the use of a third-party crane and custom designed and fabricated emergency gig should not be discounted. Where a crane can be sourced within an acceptable timeframe, the emergency gig extraction method provides a reliable safe and cost-effective means of secondary means of egress, especially when multiple shafts are to be developed. Local laws may negate the ability to employ such a system, although it is believed with good communication and well-constructed risk assessments, this system can be safely deployed.
Citation

APA: S Green R Austerberry  (2021)  Secondary means of egress via emergency gig

MLA: S Green R Austerberry Secondary means of egress via emergency gig. The Australasian Institute of Mining and Metallurgy, 2021.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account