Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - Synopsis

- Organization:
- Deep Foundations Institute
- Pages:
- 4
- File Size:
- 563 KB
- Publication Date:
- Jan 1, 2010
Abstract
The progressive rise of an H-pile during driving of an adjacent pile is described in this case history in which piles 15 to 18 m long were driven to end-bearing for the foundations for a 230 m long building. The use of a reaction beam-soil anchor system for compression load tests is discussed. The results of static load tests to determine pile capacity are compared with those obtained by the Pile Driving Analyzer and by theory. Unusual high temporary compressions were observed by field control staff. Proof testing was necessary to determine the need for restriking of some piles in which rise had occurred.
Citation
APA:
(2010) Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - SynopsisMLA: Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - Synopsis. Deep Foundations Institute, 2010.