Selection, design and construction of retaining structure to support the primary crusher relocation project at Round Mountain Mine

Society for Mining, Metallurgy & Exploration
O. MacIntosh
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
5
File Size:
475 KB
Publication Date:
Jan 1, 2010

Abstract

The Round Mountain gold mine, located 90 km (55 miles) north of Tonopah, NV began large-scale production in 1977. During 2008 Round Mountain Gold Corp. (RMGC) relocated the primary crusher facility approximately 300 m (1,000 ft) to make room for the next phase of openpit mining activities. This facility was installed in 1988 and used a log-crib retaining wall and dump pocket. RMGC selected Hilfiker Retaining Walls and Collins Engineers, Inc. to provide design and materials for a new 17-m- (56-ft-) high mechanically-stabilized embankment (MSE) wall to support the haul trucks at the new location. The construction contractor was EarthTech West Ltd. of Norwood, CO. An MSE wall with a cast-in-place concrete face was chosen as a durable, yet less expensive alternative to the reinforced concrete dump pocket that was originally designed for the project. The arrangement of the MSE wall is of an unusual configuration to meet a variety of operational and maintenance requirements. This paper outlines the selection process, design and construction of the MSE wall.
Citation

APA: O. MacIntosh  (2010)  Selection, design and construction of retaining structure to support the primary crusher relocation project at Round Mountain Mine

MLA: O. MacIntosh Selection, design and construction of retaining structure to support the primary crusher relocation project at Round Mountain Mine. Society for Mining, Metallurgy & Exploration, 2010.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account