Shaft Holing Project at Bulyanhulu Gold Mine, Tanzania

- Organization:
- International Society of Explosives Engineers
- Pages:
- 12
- File Size:
- 852 KB
- Publication Date:
- Jan 1, 2011
Abstract
Bulyanhulu Gold Mine Limited (BGML) commissioned a project of sinking a Bulk Air Cooling Shaft during its programme to improve the ventilation system on the mine. As part of this project, a ventilation drift had to be developed and holed into the Main Shaft at 4920 Level. AEL Mining Services (AEL) were requested to provide a technical solution, which included monitoring of blast induced vibrations and to design drilling and timing plans to ensure blasting activities on the vent drift were conducted without disrupting the main shaft’s infrastructure.