Simultaneous Determination Of Open Pit Mine Production Planning Variables

Society for Mining, Metallurgy & Exploration
H. Sevim
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
8
File Size:
532 KB
Publication Date:
Jan 1, 1995

Abstract

Long term production planning in open pit mines requires the determination of cutoff grade, mining and milling production rates, mining sequence, mine life, and ultimate pit limits. These variables interact in a circular fashion, that is, the value of a variable can not be determined without the knowledge of the value of the preceding variable in the circle. Therefore, a genuine solution to the problem necessitates simultaneous determination of the variables. Such a solution methodology, comprised of a group of heuristic algorithms and an unconventional dynamic programming algorithm, is described in this paper. The methodology is applied to a small size Western US gold deposit to illustrate its logic and capabilities.
Citation

APA: H. Sevim  (1995)  Simultaneous Determination Of Open Pit Mine Production Planning Variables

MLA: H. Sevim Simultaneous Determination Of Open Pit Mine Production Planning Variables. Society for Mining, Metallurgy & Exploration, 1995.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account