Soil Grouting to Arrest Foundation Settlement

Deep Foundations Institute
Manos De Shuvranshu Rout Anuj K. Singh
Organization:
Deep Foundations Institute
Pages:
10
File Size:
583 KB
Publication Date:
Jan 1, 2017

Abstract

"Foundation for tracks of coke transfer car and dust extraction pipe was designed as series of isolated foundations spaced at 11.0m along length of coke oven battery resting on soil at depth of 2.5m. In one region the foundations are close to adjacent 12m deep underground junction house. Five foundations in this zone were constructed on backfilled soil without proper compaction instead of engineering soil fill or concrete fill. The foundations settled under loads and the supported frame structure tilted after equipment erection and during trials endangering the safety of the structure and equipment operation. The distorted structure had to be rectified in-situ by arresting settlement. In order to stabilize the foundation and supported structure the supporting soil had to be strengthened in situ without any dismantling, reconstruction and adverse effect to equipment operation. This paper presents the case study on the evaluation of defects for the foundation failure and analysis of the problem, proposed rectification of the situation by appropriate soil stabilization scheme, monitoring of the stabilization operations and verification of effectiveness of the rectification work by measurement of settlements. The implemented solution has ensured safety of the structure and equipment without any adverse impact on normal operation.INTRODUCTION AND BACKGROUNDNew Coke Oven Battery was being installed for an integrated Steel Plant. The hot coke from oven is pushed out after completion of coking process through a coke transfer car onto a hot coke receiving car. The coke transfer car runs on rail track parallel to the line of ovens forming the coke oven battery. One rail is supported on the structure of the operating platform of the battery and the second rail rests on independent structure of track beams. A large diameter pipe for extraction of the dust emitted during coke pushing operation is also supported on the same structure that supports the track beams. The entire structure rests on columns spaced at approximately 11.0m along the length of the battery. The columns transfer load to ground through individual foundations resting on competent subsoil strata.Two sets of foundations for the rail track beam support and dust extraction pipe support are adjacent to deep underground junction house of coke carrying conveyor. The depth of the pit for the junction house is 12m. The layout and arrangement of the foundations in this region around the junction house (JH-1) is shown in the “Figs. 1a, 1b”."
Citation

APA: Manos De Shuvranshu Rout Anuj K. Singh  (2017)  Soil Grouting to Arrest Foundation Settlement

MLA: Manos De Shuvranshu Rout Anuj K. Singh Soil Grouting to Arrest Foundation Settlement. Deep Foundations Institute, 2017.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account