Some Simple Graphical Methods for Reliability Analysis in Mines

The Australasian Institute of Mining and Metallurgy
Granholm S
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
177 KB
Publication Date:
Jan 1, 1991

Abstract

The current emphasis within the mining industry to reduce the cost of production has stimulated interest in the fields of maintenance and operational reliability of capital intensive mining equipment. From an economic point of view, high reliability is desirable to reduce the maintenance costs of the systems. Two graphical methods consider reliability analysis. The first one, the method of Total Time on Test (177)-plotting deals with the reliability data which are free from trend and serial correlation. The second method which is based on time dependent modelling approach deals with the data which are not free from trends and serial correlation. The examples show how these graphical methods can be used to calculate the optimal maintenance intervals for components or systems.
Citation

APA: Granholm S  (1991)  Some Simple Graphical Methods for Reliability Analysis in Mines

MLA: Granholm S Some Simple Graphical Methods for Reliability Analysis in Mines. The Australasian Institute of Mining and Metallurgy, 1991.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account