Specific Problems of Very Large Tunnelling Shields

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 417 KB
- Publication Date:
- Jan 1, 1995
Abstract
The appearance of very large shielded softground TBM's, of 14 m (46 ft) O.D. and more, as needed for two-lane highway tunnels, calls for a thorough search of overall stability and new solutions for front support during maintenance operations in the cutting chamber. The paper deals with the development of a shield for the planned 4 th tunnel crossing under the river Elbe in Hamburg. Specific problems arise from the high water head, the shallow overburden of loose soil and the stone-bearing mixed ground. The choice of the tunneling method and the different features provided to overcome the problems are discussed.
Citation
APA:
(1995) Specific Problems of Very Large Tunnelling ShieldsMLA: Specific Problems of Very Large Tunnelling Shields. Society for Mining, Metallurgy & Exploration, 1995.