Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice Fill

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 564 KB
- Publication Date:
- Jan 1, 1998
Abstract
Boliden Mineral AB Boliden Mineral AB operates nine mines in Northern and Central Sweden, producing zinc, lead and silver concentrates and copper and gold. Seven of these mines use cut and fill (C&F) mining with a total production of 2 Mtonnes of ore per year.
Citation
APA:
(1998) Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice FillMLA: Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice Fill. The Australasian Institute of Mining and Metallurgy, 1998.