Abstract
Stillwater Mining Company (SMC) has an extensive history with tunnel boring machines (TBM) at the Stillwater and East Boulder underground PGM mines in Montana. The most recent TBM used is for the Blitz Project, where a 5.5m (18ft) diameter main beam unit, commissioned in Q3 2012, is being utilized to drive a 6,975m (22,500 ft) ventilation and haulage level East of the Stillwater Mine for the Blitz expansion project. The assembly/commissioning of the TBM, institution of the planned diamond drilling program, application of ground control systems, and the current tunneling metrics will be covered.