Stress and Seismic Management: DMLZ’s Key Learnings - RASIM2022

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 2059 KB
- Publication Date:
- Apr 26, 2022
Abstract
PT Freeport Indonesia’s Deep Mill Level Zone (DMLZ) is one of three operating cave mines at the Grasberg mine complex. The DMLZ is situated in the East Ertsberg Skarn System (EESS). It is set 500 m below the operating DOZ mine and located approximately 1,500 m below the surface, making it one of the world’s deepest panel caving operations. Initial undercutting of the DMLZ commenced in the second half of 2015 and has expanded to more than 120,000 m2. High pre-mining stresses and the changes associated with caving, combined with a strong and brittle rock mass, led to significant seismicity and rock bursting.
Stress and seismic management are the main challenges for the operation and have evolved significantly from initial undercutting to the present. Considerable amounts of empirical data associated with ground response have been collected, evaluated and combined with historical lessons learned from the Intermediate Ore Zone (IOZ) and Deep Ore Zone (DOZ) mines, which are located within the EESS. This has provided an improved understanding of how the various geological, geotechnical and mine design criteria relate to one another. Additionally, the information has allowed for the development and implementation of improved strategies for stress and seismic management in the DMLZ.
This paper describes how these learnings have driven changes in mine geometry, layout, and support systems. Through comprehensive monitoring and detailed inspections, positive changes have been seen in the ground response, leading to an increase in footprint reliability and accelerated cave growth. The paper summarizes the key learnings at the DMLZ regarding stress and seismic management as well as the positive improvements towards sustained and safe caving operations in the DMLZ.
Citation
APA:
(2022) Stress and Seismic Management: DMLZ’s Key Learnings - RASIM2022MLA: Stress and Seismic Management: DMLZ’s Key Learnings - RASIM2022. Society for Mining, Metallurgy & Exploration, 2022.