Submerged Penetrations Through a Frozen Soil Shoring System - RETC2023

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 205 KB
- Publication Date:
- Jun 13, 2023
Abstract
Frozen soil shoring has been used for decades in the tunneling industry to provide
temporary support of excavation for shafts and cross-passage excavations. However,
horizontal penetrations through the frozen soil can prove to be challenging. The key
to creating a stable portal through frozen ground is managing and mitigating groundwater
flow into the excavation through the annular space surrounding the drill stem or
casing. This paper will review different approaches that have been successfully used
to penetrate frozen soil shoring on multiple projects.
Citation
APA:
(2023) Submerged Penetrations Through a Frozen Soil Shoring System - RETC2023MLA: Submerged Penetrations Through a Frozen Soil Shoring System - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.