Subsea Tunnel Geotechnical Investigations Pre and Post Contract Award-A Plan for Success - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 715 KB
- Publication Date:
- Jun 23, 2024
Abstract
The Musaimeer pump station and outfall project (MPSO) is in Doha Qatar. This technical paper
will discuss and explain the three major stages of geotechnical investigation employed. Stage one the tender
geotechnical data and how this was used to design the TBM and identify various areas of risk. Stage two was
the selection of supplementary geotechnical investigation methodologies. Stage three was the geotechnical
investigation by specialist equipment installed on the TBM and providing further data on a real time basis as
the TBM was advancing. Analysis of all the data will be provided along with the lessons learned.
Citation
APA:
(2024) Subsea Tunnel Geotechnical Investigations Pre and Post Contract Award-A Plan for Success - NAT2024MLA: Subsea Tunnel Geotechnical Investigations Pre and Post Contract Award-A Plan for Success - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.