Sumner Tunnel Rehabilitation - NAT2024

Society for Mining, Metallurgy & Exploration
Joe Rigney David Nowak Conrad Stacey Michael Beyer Chris Blanchard John Czach
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
8
File Size:
673 KB
Publication Date:
Jun 23, 2024

Abstract

Originally constructed in the 1930s, the 1-mile-long Sumner Tunnel is 31 feet in diameter and carries traffic deep below Boston Harbor, connecting Boston and East Boston. This project includes both design and construction for the rehabilitation of the nearly 100-year-old tunnel. The primary work includes repairing advanced deterioration at the tunnel crown with new precast arches that will add protection and strengthening. The restoration also consists of upgrading the tunnel systems, including permanently removing 75% of the existing exhaust duct suspended over the roadway to improve the overall ventilation system capacity and performance.
Citation

APA: Joe Rigney David Nowak Conrad Stacey Michael Beyer Chris Blanchard John Czach  (2024)  Sumner Tunnel Rehabilitation - NAT2024

MLA: Joe Rigney David Nowak Conrad Stacey Michael Beyer Chris Blanchard John Czach Sumner Tunnel Rehabilitation - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account