Surface Water Supply Project—Segment B3 Long Tunnel— Houston, TX - NAT2024

Society for Mining, Metallurgy & Exploration
William Hodder Nate Long Phil Rhodes Sergio Flores Tim McQueary
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
1001 KB
Publication Date:
Jun 23, 2024

Abstract

The Surface Water Supply Project Segment B3 is a 4 miles section of tunnel that will run East- West in Houston TX, from Hopper St to I-45. The tunnel will be mined by using a 128" Dia refurbished 1987 Lovat Tunnel Boring Machine capable of operating in Open or EPB mode. The tunnel will be temporarily supported with ribs and lagging and a 96" Dia pipe will be grouted into place. All four miles of this project are within Petroleum Pipeline Easements. The project includes seven shafts, 2000' of tunnel in potentially petroleum contaminated ground, crossing the Hardy Toll 􀀵d, I-45, the 􀀸nion Paci􀂿c 􀀵ailroad 􀀵ight of Way and multiple oil and gas pipeline crossings. This paper summarizes the planning and drive performed to date.
Citation

APA: William Hodder Nate Long Phil Rhodes Sergio Flores Tim McQueary  (2024)  Surface Water Supply Project—Segment B3 Long Tunnel— Houston, TX - NAT2024

MLA: William Hodder Nate Long Phil Rhodes Sergio Flores Tim McQueary Surface Water Supply Project—Segment B3 Long Tunnel— Houston, TX - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account