Systhesis of Stochastic Recovery Prediction Cut-off Optimisation

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 4
- File Size:
- 329 KB
- Publication Date:
- Jan 1, 1998
Abstract
Cut-off optimisation, based on the work of Lane (1988), can be used to maximise the NPV (Net Present Value) of a mine by the judicious manipulation of cut-offs and the use of stockpiles. Apart from maximising NPV, cut-off optimisation will ver
Citation
APA:
(1998) Systhesis of Stochastic Recovery Prediction Cut-off OptimisationMLA: Systhesis of Stochastic Recovery Prediction Cut-off Optimisation. The Australasian Institute of Mining and Metallurgy, 1998.