TBM and Logistics for Constructing Twin Tunnels Between Artificial Islands in Hampton Roads - RETC2021

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 2811 KB
- Publication Date:
- Jun 13, 2021
Abstract
The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in coastal Virginia, USA will add two 1.5-mile (2.4 km) TBM bored tunnels alongside two existing immersed-tube tunnels between artificial islands. The site’s unusual constraints and the requirements of a large-diameter variable-density TBM shaped the design-builder’s decisions for handling TBM inputs and outputs, siting the TBM plant and supporting equipment, and sequencing tunnel-construction operations. This paper addresses the logistics necessary to enable key functions of the 46-ft (14-m) TBM and its ancillary equipment, including transport of most materials by barge, U-turn of the TBM on an artificial island, and delivery of materials for the second tunnel through the first one while interior structures are under construction.
Citation
APA:
(2021) TBM and Logistics for Constructing Twin Tunnels Between Artificial Islands in Hampton Roads - RETC2021MLA: TBM and Logistics for Constructing Twin Tunnels Between Artificial Islands in Hampton Roads - RETC2021. Society for Mining, Metallurgy & Exploration, 2021.