Tehachapi, CA, Double-Track Project, Rock Slope Design and Excavation

- Organization:
- International Society of Explosives Engineers
- Pages:
- 10
- File Size:
- 2315 KB
- Publication Date:
- Jan 1, 2017
Abstract
"Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to improve operations in this area. The total project proposes an upgrade of five segments along the Tehachapi-Bakersfield route. The authors focused on two segments: Walong to Marcel and Cliff Siding Extension. The second track project comprised design of a through-cut adjacent to an existing tunnel and up to 120-feet-high (36m) side-hill cuts (both in granitic rock). The authors characterized the geologic ground conditions and ground behavior, including rock mass quality and strength using a combination of rock core drilling and rock slope mapping. The rock mass is generally characterized as granitic tonalite with strong core stones surrounded by a matrix of decomposed granite (DG)."
Citation
APA:
(2017) Tehachapi, CA, Double-Track Project, Rock Slope Design and ExcavationMLA: Tehachapi, CA, Double-Track Project, Rock Slope Design and Excavation. International Society of Explosives Engineers, 2017.