The Alptransit Lötschberg Project, Switzerland: High Performance Wet-Mix Sprayed Concrete During TBM Excavation of Two High-Speed Railway Tunnels

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 15
- File Size:
- 2115 KB
- Publication Date:
- Jan 1, 2003
Abstract
High performance sprayed concrete equipment installed on two 9.4 m diameter hard rock TBMs enabled a continuous sprayed concrete lining for the entire contour in both tunnels to be performed concurrently with the advancing TBMs. Innovative layout of the sprayed concrete arrangements comprised ring beam constructions each with two independent spraying robots. Each of the spraying robots were independently connected to sprayed concrete pumps, as well as a high capacity concrete logistics system on the backup. The mix designs focused on long open-time, excellent pumpability and tough requirements on strength development. The achieved output capacities of the sprayed concrete amounts to an average of 15 m3 per hour. Peak capacities of 24 m3 per hour have been realized.
Citation
APA:
(2003) The Alptransit Lötschberg Project, Switzerland: High Performance Wet-Mix Sprayed Concrete During TBM Excavation of Two High-Speed Railway TunnelsMLA: The Alptransit Lötschberg Project, Switzerland: High Performance Wet-Mix Sprayed Concrete During TBM Excavation of Two High-Speed Railway Tunnels. Society for Mining, Metallurgy & Exploration, 2003.