The Development of Computer - Aided Underground Mine Planning at Nkana Division of ZCCM Limited

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 403 KB
- Publication Date:
- Jan 1, 1996
Abstract
In planning for the future, Nkana Division deepened the Mindola sub-vertical shaft which was commissioned in 1994 in order to access the 30 Mt of ore between 1274 and 1570 m levels. The Nkana Synclinorium which is estimated to contain 250 Mt of ore is being accessed from the vicinity of Central Shaft. These areas are being planned with the intention of maximizing the use of computers in geological modelling and mine design so as to overcome the inadequacies of manual planning techniques. As a result, there is an increased demand for quality output from the computerized mine planning system the division has been developing over the last few years. A new workstation comprising the Hewlett Packard HP 71 51100 MHz and a CRX graphics monitor was acquired in 1995 together with the LYNX (version 3.09 and version 4.0) Mine Modelling System. Currently the workstation is being used for geological modelling and mine design for the Zerofold at Central Shaft and the Mindola mining at depth project. AutoCAD and Mine Works Planner have been added to the sys- tem configuration. Mine Works Planner is likely to replace Lo- tus123 for mine scheduling tasks. Computer applications in the area of mine planning at Nkana has led to considerable time savings and improved efficiency in areas formerly performed manually and has allowed speedy processing of data that would otherwise have proved too time consuming. Nevertheless, a lot of work still needs to be done in the areas of geostatistics, stope design and financial modelling of mining options. For the foreseeable future computer based planning will operate parallel to manual methods until such a time as sufficient personnel are proficient in the use of computer systems. This paper describes the program of computerization at Nkana Division, reviews current applications and the benefits and experience gained and discusses the promise of current and future developments.
Citation
APA:
(1996) The Development of Computer - Aided Underground Mine Planning at Nkana Division of ZCCM LimitedMLA: The Development of Computer - Aided Underground Mine Planning at Nkana Division of ZCCM Limited. Society for Mining, Metallurgy & Exploration, 1996.