TBM utilization rate is a component of machine performance prediction and critical for developing a reliable estimate of the construction completion time and cost of the tunnel. Estimation of the utilization rate involves identifying and quantifying the time dedicated to each activity in a tunneling jobsite. Ring building is a common activity in TBM tunneling and takes a large amount of tunnel excavation time when using shielded TBMs. This paper concentrates on the effect of tunnel diameter on the duration of downtimes related to ring building and examines the impact of machine diameter on downtimes. For this purpose, the dependency of segment installation time to segment configuration, and also the diameter of the tunnel was investigated. Furthermore, the ring building time for four tunnels with different sizes of diameters and a variety of ring arrangement were analyzed and the relationship between TBM diameter and segment installation time and consequently TBM utilization was evaluated.
Citation

APA: Tala Tahernia Jamal Rostami  (2021)  The Effect of TBM Diameter on Ring Installation Time - RETC2021

MLA: Tala Tahernia Jamal Rostami The Effect of TBM Diameter on Ring Installation Time - RETC2021. Society for Mining, Metallurgy & Exploration, 2021.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account