The Greenstone Resources Ltd. Santa Rosa Heap Leaching Project, Panama

The Minerals, Metals and Materials Society
Randy Martin
Organization:
The Minerals, Metals and Materials Society
Pages:
1
File Size:
23 KB
Publication Date:
Jan 1, 1997

Abstract

"Greenstone Resources Ltd. constructed and operates the Santa Rosa open pit, heap-leach gold mine in Veraguas, Panama. The project was commissioned in 1995 at a designed capacity of 1.8 million tons per year. The ore exhibits a long leach up to three years, and requires three stage crushing to minus 3/8 inch to achieve on average a 74% gold recovery. The crushing plant is required to handle high volumes of clay and the circuit includes a Barmac Crusher. Panama receives over 3 meters of rain annually and Greenstone is using innovative means to control the project's water balance. Greenstone has developed a successful approach to operating a low grade (1.5 gm Au/T) deposit under difficult operation conditions.ABSTRACT ONLY"
Citation

APA: Randy Martin  (1997)  The Greenstone Resources Ltd. Santa Rosa Heap Leaching Project, Panama

MLA: Randy Martin The Greenstone Resources Ltd. Santa Rosa Heap Leaching Project, Panama. The Minerals, Metals and Materials Society, 1997.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account