The Installation of a Final Cleaning Column at Ok Tedi

The Australasian Institute of Mining and Metallurgy
Kilgour I
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
672 KB
Publication Date:
Jan 1, 1991

Abstract

The installation of a final cleaning column at Ok Tedi Mining Limited was carried out to increase final concentrate grade in order to reduce concentrate handling, shipping and treatment charges and to reduce penalty payments. To fast-track the project a decision was made to install a full-size column on one of the two parallel circuits, designed on information readily available and utilising the experience of mill staff and an engineering consultant, rather than delay installation while a pilot scale program was conducted. A 3.66 m diameter by 12.8 m high column was installed to produce 40 t/h of final concentrate from a combination of rougher concentrate and recleaner concentrate. The column design and sparger system were by Cominco Engineering Services Limited.
Citation

APA: Kilgour I  (1991)  The Installation of a Final Cleaning Column at Ok Tedi

MLA: Kilgour I The Installation of a Final Cleaning Column at Ok Tedi. The Australasian Institute of Mining and Metallurgy, 1991.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account