The New Look at Asarco's Tennessee Mines

The American Institute of Mining, Metallurgical, and Petroleum Engineers
Ta M. Li
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
5
File Size:
754 KB
Publication Date:
Jan 5, 1976

Abstract

Expanded mine-mill capacity and greater operating flexibility are part of the dramatic changes taking place in the Tennessee mining operations of Asarco, Inc. Climaxed by the recent start-up of the $6.3 million Young mill in September 1975, Asarco has pushed Tennessee back into number one position as the leading zinc mining state. Furthermore, start-up of the Young mill is expected to insure a much-needed and continuing domestic zinc supply, at a time when US mines can only supply one-half of 1975 domestic consumption.
Citation

APA: Ta M. Li  (1976)  The New Look at Asarco's Tennessee Mines

MLA: Ta M. Li The New Look at Asarco's Tennessee Mines. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1976.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account