The New Look at Asarco's Tennessee Mines

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 5
- File Size:
- 754 KB
- Publication Date:
- Jan 5, 1976
Abstract
Expanded mine-mill capacity and greater operating flexibility are part of the dramatic changes taking place in the Tennessee mining operations of Asarco, Inc. Climaxed by the recent start-up of the $6.3 million Young mill in September 1975, Asarco has pushed Tennessee back into number one position as the leading zinc mining state. Furthermore, start-up of the Young mill is expected to insure a much-needed and continuing domestic zinc supply, at a time when US mines can only supply one-half of 1975 domestic consumption.
Citation
APA:
(1976) The New Look at Asarco's Tennessee MinesMLA: The New Look at Asarco's Tennessee Mines. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1976.