The Nokomai Gold Mining Project

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 21
- File Size:
- 2077 KB
- Publication Date:
- Jan 1, 1992
Abstract
The Nokomai Gold Mining Project commenced production in January 1992. The Project continues a history of mining in theNokomai Valley which extended from 1863 to 1942. L & M Mining Limited have held interests in the valley since 1980. In 1990 the Nokomai Joint Venture was formed with the Hore family, the owners of Nokomai Station, to mine a large alluvial gold resource in the valley. The mine is located adjacent to the Mataura Brown Trout fishery and required extensive environmental studies prior to granting of permits. The mine is budgeted to work for 20 months, processing 460 000 m3 of wash material. During this period, contract miners, Downer Mining Limited, will move in excess of seven million cubic metres of overburden from the deposit.
Citation
APA:
(1992) The Nokomai Gold Mining ProjectMLA: The Nokomai Gold Mining Project. The Australasian Institute of Mining and Metallurgy, 1992.