The SM3 Power Project Design Characteristics and Excavation Methods

Society for Mining, Metallurgy & Exploration
Claude Boisjoly Don Nguyen Pierre de Courval
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
146 KB
Publication Date:
Jan 1, 1997

Abstract

The Sainte-Marguerite-3 (SM3) hydro project, presently under construction, requires the excavation of an underground powerhouse and large water conveyance tunnels. This paper describes the planning of the project, main features of underground structures, excavation techniques and ground support.
Citation

APA: Claude Boisjoly Don Nguyen Pierre de Courval  (1997)  The SM3 Power Project Design Characteristics and Excavation Methods

MLA: Claude Boisjoly Don Nguyen Pierre de Courval The SM3 Power Project Design Characteristics and Excavation Methods. Society for Mining, Metallurgy & Exploration, 1997.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account