Abstract
The Sainte-Marguerite-3 (SM3) hydro project, presently under construction, requires the excavation of an underground powerhouse and large water conveyance tunnels. This paper describes the planning of the project, main features of underground structures, excavation techniques and ground support.
Citation
APA:
(1997) The SM3 Power Project Design Characteristics and Excavation MethodsMLA: The SM3 Power Project Design Characteristics and Excavation Methods. Society for Mining, Metallurgy & Exploration, 1997.