The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

International Conference on Ground Control in Mining
Stephen Tadolini
Organization:
International Conference on Ground Control in Mining
Pages:
7
File Size:
1116 KB
Publication Date:
Jan 1, 2007

Abstract

A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar, created in approximately the middle of a longwall panel at a depth of 650 ft, transformed from a solid barrier pillar - to a yielding pillar - to a residual pillar as 3 ft slices were methodically removed with the longwall shearer. The complete transformation, or life cycle, took place in less than 12 hours. The stresses were quickly transferred from the pillar onto the standing pumpable concrete supports and into the outby pillars. Roof to floor closure measurements, combined with the timing of the pillar behavior, provides a detailed look at the uncontrollable convergence of underground mine openings. Pillars remain the most important form of ?primary support? and understanding these life cycles is vital for safe and efficient mine design, in both room and pillar and longwall panel extractions.
Citation

APA: Stephen Tadolini  (2007)  The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

MLA: Stephen Tadolini The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244). International Conference on Ground Control in Mining, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account