The Widening of the “Montedomini” A14 Motorway Tunnel in the Presence of Traffic

Society for Mining, Metallurgy & Exploration
Giuseppe Lunardi Saverio Agresti Donato Basta Roberto Trapasso
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
5443 KB
Publication Date:
Jan 1, 2016

Abstract

"At a distance of 10 years from the first application of the Nazzano Method, the widening under traffic of a tube of an existing motorway tunnel was realized near Ancona, along the A14 Motorway in Italy. This paper describes the works for the enlargement with conventional method of the second tube, very close to that already widened under traffic.This enlargement was realized very fast, taking into account the advantages of some interesting technological improvements of the Final Design proved in the first tube.INTRODUCTION TO THE WIDENING OF EXISTING MOTORWAY TUNNELSThe widening of a twin-bore motorway tunnel usually considers the double option of creating a third bore as an alternative or closure to traffic of one of the two bores with the resulting reduction in the level of service for users.On the contrary, the extension in situ of a road, motorway, railway or underground tunnel in the presence of traffic, made possible by an inspired idea of Prof. Pietro Lunardi, enables the level of service of the infrastructure to be maintained without the need to resort to alternative routes to create new permanent or temporary bores, not always feasible because of the lack of the necessary space.This construction technique, known as the ‘Nazzano Method’, is part of the technologies refined and offered by the ADECO-RS approach to tunnel design and construction (Lunardi P., 2008) which is increasingly used in the world, leading to the industrialisation of tunnelling (meaning respect for the times and costs set out during detailed design) both in conventional and mechanised (through TBM) excavations.The first true experimentation of the ‘Nazzano Method’ was carried out between 2004 and 2007 to enlarge the two-bore ‘Nazzano’ tunnel (Italy, Milan-Rome A1 motorway) in the presence of traffic, widening it to house from two to four lanes in each direction (Lunardi P. et al., 2007). Following the success achieved in this first application, the Nazzano Method was strengthened considering all the possible suggestions arising from the previous experience and then taken up to enlarge the north bore of the ‘Montedomini’ two-bore tunnel (Italy, Bologna-Taranto A14 motorway), in situ and the presence of traffic."
Citation

APA: Giuseppe Lunardi Saverio Agresti Donato Basta Roberto Trapasso  (2016)  The Widening of the “Montedomini” A14 Motorway Tunnel in the Presence of Traffic

MLA: Giuseppe Lunardi Saverio Agresti Donato Basta Roberto Trapasso The Widening of the “Montedomini” A14 Motorway Tunnel in the Presence of Traffic. Society for Mining, Metallurgy & Exploration, 2016.