Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 14
- File Size:
- 1027 KB
- Publication Date:
- Jun 23, 2024
Abstract
The Parallel Thimble Shoal Tunnel (PTST) project is a part of the Chesapeake Bay Bridge-
Tunnel (CBBT) complex. The project involves the construction of a two-lane bored tunnel under the Thimble
Shoal Channel between Portal Island #1 (the southernmost island) and Portal Island #2. The new PTST will be
the rst transportation tunnel constructed in the Mid-Atlantic region by a tunnel boring machine (TBM). This
paper describes the design and construction of the tunnel approach structure in an open marine environment
with the strategies employed to overcome the various construction challenges. The project is unique since the
entire tunnel approach structure is built on a very limited area within an open marine environment without any
reclamation of the existing island.
Citation
APA:
(2024) Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024MLA: Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.