Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024

Society for Mining, Metallurgy & Exploration
Sandeep Pyakurel Frank Perrone Mitchell Gerdtau Eric Crocker Joan Carles Casado Ortega
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
14
File Size:
1027 KB
Publication Date:
Jun 23, 2024

Abstract

The Parallel Thimble Shoal Tunnel (PTST) project is a part of the Chesapeake Bay Bridge- Tunnel (CBBT) complex. The project involves the construction of a two-lane bored tunnel under the Thimble Shoal Channel between Portal Island #1 (the southernmost island) and Portal Island #2. The new PTST will be the 􀂿rst transportation tunnel constructed in the Mid-Atlantic region by a tunnel boring machine (TBM). This paper describes the design and construction of the tunnel approach structure in an open marine environment with the strategies employed to overcome the various construction challenges. The project is unique since the entire tunnel approach structure is built on a very limited area within an open marine environment without any reclamation of the existing island.
Citation

APA: Sandeep Pyakurel Frank Perrone Mitchell Gerdtau Eric Crocker Joan Carles Casado Ortega  (2024)  Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024

MLA: Sandeep Pyakurel Frank Perrone Mitchell Gerdtau Eric Crocker Joan Carles Casado Ortega Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account