Tk-csa New Rh Installation – Moving To Industry 4.0 Solution

Associacao Brasileira de Metalurgia,  Materiais e Mineracao
Andrea Pezza
Organization:
Associacao Brasileira de Metalurgia, Materiais e Mineracao
Pages:
9
File Size:
1396 KB
Publication Date:
Oct 30, 2017

Abstract

The paper describes the recent new installation and start-up of the second RH (Recirculation Degasser) in Rio de Janeiro plant of thyssenkrupp CSA Siderúrgica do Atlântico. The new plant is installed as part of the existing RH, the twin solution increases the overall melt shop production in the area of quality plates especially for deep drawing grades. With this new equipment, CSA is able to increase degassed grades production with a state of art asset that has the ultimate technology in operation, safety and automation. The description of the main components parts and the operational concept gives an overview of the latest experience in RH plant engineering combined with best operational practice of world class steel producer.
Citation

APA: Andrea Pezza  (2017)  Tk-csa New Rh Installation – Moving To Industry 4.0 Solution

MLA: Andrea Pezza Tk-csa New Rh Installation – Moving To Industry 4.0 Solution. Associacao Brasileira de Metalurgia, Materiais e Mineracao, 2017.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account