Transition From Open Pit To Underground Mining At Chuquicamata, Antofagasta, Chile

The Southern African Institute of Mining and Metallurgy
Sergio Olavarría Patricio Adriasola Antonio Karzulovic
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
14
File Size:
1217 KB
Publication Date:
Jan 1, 2006

Abstract

The economical analyses of different Chuquicamata open pit mine planning scenarios, indicate that the pit closure should occur at latest in the year of 2017. However, about 60,000 m of drill holes have demonstrated that below the pit bottom there is a potential of 2.3 billion tons of ore. Hence, Division Codelco Norte developed the scoping engineering for a large underground panel caving operation, similar to El Teniente mine. This project considers the exploitation of a 2500 m 300 m footprint, with three 250 m lifts. The plan considers to initiate the construction in the year 2009, to begin the production in the year 2015 and achieve a production rate of 45 million tons per year in the year 2021. A large-scale transition from open pit to underground mining like this one presents three main challenges: (1) to include the geotechnical aspects relevant for mine design and mine planning, (2) to define the proper surface and underground infrastructure, and (3) to fulfil the project deadlines and to achieve the production targets. This paper summarizes this transition project and discusses these three main challenges.
Citation

APA: Sergio Olavarría Patricio Adriasola Antonio Karzulovic  (2006)  Transition From Open Pit To Underground Mining At Chuquicamata, Antofagasta, Chile

MLA: Sergio Olavarría Patricio Adriasola Antonio Karzulovic Transition From Open Pit To Underground Mining At Chuquicamata, Antofagasta, Chile. The Southern African Institute of Mining and Metallurgy, 2006.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account