TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open Cut

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 5
- File Size:
- 428 KB
- Publication Date:
- Jan 1, 1989
Abstract
In the future to excavate sufficient coal for power generation, two dredgers would be required to dig overburden or interseam 70010 of the time and three dredgers 40010 of the time. One overburden system was not adequate for this requirement, making coal production reliability vulnerable. TS5 spreader is the new machine element of this system. The selection of the best type of machine configuration to suit the application was then subject to an internal SECV VE Study, a registration of interest and a tender for two machine alternatives. This paper outlines the reasons why SECV planned the Secondary Overburden System and how the Krupp machine met these requirements. It also identifies the main design features of the machine and its constructability which will allow the machine to be operational by the end of May, 1990.
Citation
APA: (1989) TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open Cut
MLA: TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open Cut. The Australasian Institute of Mining and Metallurgy, 1989.