TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open Cut

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
5
File Size:
428 KB
Publication Date:
Jan 1, 1989

Abstract

In the future to excavate sufficient coal for power generation, two dredgers would be required to dig overburden or interseam 70010 of the time and three dredgers 40010 of the time. One overburden system was not adequate for this requirement, making coal production reliability vulnerable. TS5 spreader is the new machine element of this system. The selection of the best type of machine configuration to suit the application was then subject to an internal SECV VE Study, a registration of interest and a tender for two machine alternatives. This paper outlines the reasons why SECV planned the Secondary Overburden System and how the Krupp machine met these requirements. It also identifies the main design features of the machine and its constructability which will allow the machine to be operational by the end of May, 1990.
Citation

APA:  (1989)  TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open Cut

MLA: TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open Cut. The Australasian Institute of Mining and Metallurgy, 1989.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account