Tunnel Design for When H2O meets FeS2 Underground - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 500 KB
- Publication Date:
- Jun 23, 2024
Abstract
The CSO 52 Storage Tunnel and Pump Station project consists of 4,700 ft of hard rock tunnel,
2 intakes, and a 4 MGD wet pit pump station. During the geotechnical investigation, it was determined that
the host geology contained abundant suldes. The purpose of this paper is to detail the investigation and
subsequent determination that acid producing materials would affect the project during construction as well as
long-term exposure of tunnel lining and permanent components during the operational life cycle of the tunnel
and pump station. Details regarding the interaction between tunnel components and the acid producing material
are also provided.
Citation
APA:
(2024) Tunnel Design for When H2O meets FeS2 Underground - NAT2024MLA: Tunnel Design for When H2O meets FeS2 Underground - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.