Tunnel Design for When H2O meets FeS2 Underground - NAT2024

Society for Mining, Metallurgy & Exploration
Adam Bedell Jim Finley Eric Schrader
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
7
File Size:
500 KB
Publication Date:
Jun 23, 2024

Abstract

The CSO 52 Storage Tunnel and Pump Station project consists of 4,700 ft of hard rock tunnel, 2 intakes, and a 4 MGD wet pit pump station. During the geotechnical investigation, it was determined that the host geology contained abundant sul􀂿des. The purpose of this paper is to detail the investigation and subsequent determination that acid producing materials would affect the project during construction as well as long-term exposure of tunnel lining and permanent components during the operational life cycle of the tunnel and pump station. Details regarding the interaction between tunnel components and the acid producing material are also provided.
Citation

APA: Adam Bedell Jim Finley Eric Schrader  (2024)  Tunnel Design for When H2O meets FeS2 Underground - NAT2024

MLA: Adam Bedell Jim Finley Eric Schrader Tunnel Design for When H2O meets FeS2 Underground - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account