Tunnel Euralpin Lyon Turin CO8-Design of Temporary Support Profile of Base Tunnels and Cross-Passages - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 1054 KB
- Publication Date:
- Jun 23, 2024
Abstract
The new Lyon-Turin railway project involves the construction of a 57 km twin-tube tunnel between France and Italy. Pini France (project leader) and Systra-SWS are the designers of Construction Site 8 (CO8). This part of the project includes the construction of the tunnel portal on the Villard-Clément platform, two 2.8 km long tubes of the base tunnel in the direction of Saint Martin la Porte, the cross-passages between tubes and the niches.
This paper presents the general approach followed to design the temporary support for the base tunnel, cross-passages, and technical rooms. The design of the temporary support accounts for the variability of the ground and water conditions, the excavation attended behavior, the construction planning and the identified geological hazards that could be encountered along the alignment.
Particular attention is paid to the intersections between the tunnels both in terms of numerical modelling and construction methods and phases. Two types of intersections are present in the project: the intersections between the cross-passages and the base tunnel and the intersections between the base tunnel and the niches. 3D models have been developed for the tunnel intersections.
Citation
APA:
(2024) Tunnel Euralpin Lyon Turin CO8-Design of Temporary Support Profile of Base Tunnels and Cross-Passages - NAT2024MLA: Tunnel Euralpin Lyon Turin CO8-Design of Temporary Support Profile of Base Tunnels and Cross-Passages - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.