Abstract
The City of Toronto’s Coxwell Bypass Tunnel (CBT) is currently being constructed by North Tunnel Constructors ULC. The scope of the CBT project includes construction of approximately 10.5 km of 6.3 meter finished diameter rock tunnel, five large diameter (20 and 22 meter) storage shafts and eleven tunnel connection drop shafts, along with associated deaeration and adit tunnels. This paper describes progress on the CBT to date and reviews the approach taken in both design and construction of the tunnels and shafts to mitigate risks and reduce cost and schedule of construction.
Citation
APA:
(2021) Tunneling in Toronto Shale—Construction of Coxwell Bypass Tunnel Project - RETC2021MLA: Tunneling in Toronto Shale—Construction of Coxwell Bypass Tunnel Project - RETC2021. Society for Mining, Metallurgy & Exploration, 2021.