Tunneling Under Pleasure Bay with an Open-Face TBM - RETC 2021

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 2912 KB
- Publication Date:
- Jun 13, 2021
Abstract
The Two Rivers Water Reclamation Authority (TRWRA) in Monmouth County, New Jersey, is replacing its aging Pleasure Bay Interceptor (PBI) with a new 54-in interceptor in a 3,250-foot long 8 to 10-foot diameter tunnel and a new 50-mgd main pump station (MPS). A comprehensive phased geotechnical investigation was performed, including SPTs, CPTs and geophysics. A channel filled with soft marine sediments was identified. The tunnel is set in stiff to hard marine soil to enable using a less expensive open-face TBM. The thickness of tunnel cover under the channel is optimized through numerical analyses to avoid a deeper pump station yet maintaining tunnel stability with controlling seepage.
Citation
APA:
(2021) Tunneling Under Pleasure Bay with an Open-Face TBM - RETC 2021MLA: Tunneling Under Pleasure Bay with an Open-Face TBM - RETC 2021. Society for Mining, Metallurgy & Exploration, 2021.