Underground Mining Methods at Prgera Mine
    
    - Organization:
 - The Australasian Institute of Mining and Metallurgy
 - Pages:
 - 6
 - File Size:
 - 5346 KB
 - Publication Date:
 - Jan 1, 1991
 
Abstract
The Porgera Joint Venture commenced  production during September 1990. A small  tonnage underground mine extracts high  grade gold ore using small scale stopes.  Conventional drill and blast methods are  used for development and production mining. Ground support is effected with  Splitset anchors, grouted rebar bolts and  grouted cable bolts. Splitsets and grouted  rebar can be installed by mechanised means. Vertical crater retreat, slot and  massfire, and modified VCR stoping tech- niques are used at Porgera. Stopes are backfilled with a relatively  strong cemented rockf ill. Future stope  sequences require recovery of pillars  beside and under filled stopes.
Citation
APA: (1991) Underground Mining Methods at Prgera Mine
MLA: Underground Mining Methods at Prgera Mine. The Australasian Institute of Mining and Metallurgy, 1991.