Underground Mining Operations at The Selwyn Project
 
    
    - Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 716 KB
- Publication Date:
- Jan 1, 1988
Abstract
Since the 1950's drilling has been  rapidly mechanised. First from hand held  drills with air legs to pneumatic jumbos,  then to more effective hydraulic jumbos.  Development of underground drilling  equipment naturally could not have stopped  here. Hydraulic drilling saw an improvement  in drilling capacity and efficiency after  the introduction of second generation  drifters in the early 1980's. Also in the early 1980's a few  equipment suppliers started to study how to  improve the efficiency in operating the rigs. The first computerised rigs for  tunnelling were delivered to work sites in  mid 1980's. At the same time a few  computerised longhole drills started  drilling in mines.
Citation
APA: (1988) Underground Mining Operations at The Selwyn Project
MLA: Underground Mining Operations at The Selwyn Project. The Australasian Institute of Mining and Metallurgy, 1988.
