Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry Mining

The Australasian Institute of Mining and Metallurgy
J Siliézar
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
7
File Size:
1024 KB
Publication Date:
Jul 11, 2011

Abstract

The Ernest Henry Mine (EHM) is situated 38 km north-east of Cloncurry in the Mount Isa – Cloncurry mineral district of northwest Queensland. The EHM orebody is an iron oxide copper gold deposit with an average grade of one per cent copper, 0.5 g/t gold and 23 per cent magnetite, with current reserves of approximately 88 Mt.The copper concentrator is a single line plant with a nominal throughput rate of 1300 tonnes per hour. An average of 350 000 tonnes of concentrate is produced each year containing around 100 000 tonnes of copper metal and 120 000 troy ounces of gold.In December 2009, Xstrata Copper announced approval of a $589 M investment to extend the life of EHM to at least 2024, through the transformation of open pit mining operations to a major underground mine together with the construction of an associated magnetite extraction plant.The EHM magnetite plant extracts the magnetite from the copper concentrator’s tailings stream. It will produce approximately 1.2 Mt of magnetite concentrate per annum at full capacity for export to Asia, making EHM Queensland’s first iron ore concentrate exporter. Construction of the magnetite extraction plant commenced in July 2010 and was completed in January 2011.This paper gives an overview of the development of the EHM magnetite extraction plant flow sheet from the early mineralogy and laboratory test work through to the plant commissioning and early operation of the base plant. It has a major focus on the commissioning learnings from the plant start-up and includes a review of the operational performance of the plant versus original design and expectations.
Citation

APA: J Siliézar  (2011)  Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry Mining

MLA: J Siliézar Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry Mining. The Australasian Institute of Mining and Metallurgy, 2011.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account