Upper Rouge Tunnel CSO Control

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 325 KB
- Publication Date:
- Jan 1, 2007
Abstract
To mitigate and control the combined sewer overflows from 17 outfalls in the City of Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township, the Detroit Water and Sewerage Department has completed the preliminary design of a storage tunnel in 2005. In 2006, a final design has revised the alignments and the inside diameter (ID) of the tunnel. The revised tunnel system includes an 11.28-km(7-miles) 9.14-m (30-ft) ID tunnel, a 24.4-m (80-ft) ID pump station, two work shafts about 15.2-m (50-ft) ID each, and 14 drop shafts with various IDs. This paper discusses the latest development of this tunnel system.
Citation
APA:
(2007) Upper Rouge Tunnel CSO ControlMLA: Upper Rouge Tunnel CSO Control. Society for Mining, Metallurgy & Exploration, 2007.