Upper Rouge Tunnel CSO Control

Society for Mining, Metallurgy & Exploration
Wern-ping Chen Mirza M. Rabbaig Robert Barbour Jean Habimana Jinyuan Liu
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
325 KB
Publication Date:
Jan 1, 2007

Abstract

To mitigate and control the combined sewer overflows from 17 outfalls in the City of Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township, the Detroit Water and Sewerage Department has completed the preliminary design of a storage tunnel in 2005. In 2006, a final design has revised the alignments and the inside diameter (ID) of the tunnel. The revised tunnel system includes an 11.28-km(7-miles) 9.14-m (30-ft) ID tunnel, a 24.4-m (80-ft) ID pump station, two work shafts about 15.2-m (50-ft) ID each, and 14 drop shafts with various IDs. This paper discusses the latest development of this tunnel system.
Citation

APA: Wern-ping Chen Mirza M. Rabbaig Robert Barbour Jean Habimana Jinyuan Liu  (2007)  Upper Rouge Tunnel CSO Control

MLA: Wern-ping Chen Mirza M. Rabbaig Robert Barbour Jean Habimana Jinyuan Liu Upper Rouge Tunnel CSO Control. Society for Mining, Metallurgy & Exploration, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account